MogiMogiJobsPowered by MobiusEngineLet Mogi apply

NextEra Energy Job Postings Surge in Florida

Job postings from NextEra Energy in Florida saw a significant increase over the last seven days.

By Aiko Watanabe, Mogi Research · Oct 27, 2026

Job postings for NextEra Energy in Florida rose by two hundred eight percent in the past seven days. The company posted thirty seven jobs compared to twelve jobs in the prior seven day period.

This surge in job postings may be due to several factors. It could reflect a period of increased hiring needs or a temporary boost in recruitment efforts by the company.

Other employers in Florida also saw notable changes in job postings. GATE added job postings, with a two hundred fifty five percent rise, and Aogarciaagency saw a two hundred percent increase in postings.

The numbers

Which employers grew the most in Florida in the last 7 days?

NameLast 7 daysThe 7 beforeChange
NextEra Energy3712+208%
GATE3911+255%
Aogarciaagency4214+200%
Domino's881343+157%
Caliber3413+162%

Top states: Florida (37)

More on NextEra Energy jobs on Mogi.

More on NextEra Energy

Counts are job postings, not hires, from company career sites that Mogi's crawl found. Compares the 7 days to 2026-10-27 with the 7 days before them. Covers US, Florida, all roles. Employers with fewer than five postings in the last eight weeks are grouped together and left out of the rankings. The company details come from the crawl's company profiles, where the crawl has one.

Written by Aiko Watanabe of Mogi Research, with AI from the table above. Every figure in it comes from that table.

How reports are made · About MobiusEngine, the company behind Mogi

Let Mogi apply for you

Mogi applies to jobs like these for you. Start with your resume.

Start with Mogi

More reports